LARGE  SCALE  MODEL TRAINS

TRAIN PHOTOS PAGE  2 OF 8

Please be patient while the page loads the pictures
Return to

Go back to
Go to

John's E-Mail
Home Page
Train Photos 1
Train Photos 3
Click Here
Trains Page








All the steel construction finished.

(The steel stringers and cross braces
are assembled using pop rivets
).







The top deck ties installed.

(The wood ties are 1 3/4"
high, 3/4" wide & 20" long. 
They have been soaked in
used motor oil).






Track being placed on the bridge.

(The bridge is 40 feet long and
about a 60 foot radius.  This view
is south
).




 


The top deck with rails installed.

(The center guard rails are made
of wood.  The safety islands are
removable for r
unning as you can
hit them with your feet.  Don't
ask me how I know this).




 


First run over the new bridge.

(John tests out the new bridge
with the F7 and his easy chair in
 his gondola riding car).

 
 





 
 
Over the bridge again going the
other way.

 

(This is the operators view of the
bridge.  The red barrels are those
mini Pepsi soda cans
).
 




<<<BACK Train Photos 2 of  8 NEXT>>>

Web Page designed & maintained by JRY
 Last Updated: 11-20-06
<<<< Always Under Construction >>>>