| Here
is the old west side of Pottery Hill curve and grade. (The top of the hill is at the
bend. It is hard |
![]() |
![]() |
The Pottery
Hill
cut.
(The roadbed has been |
| |
The
big cut
at Pottery Hill. (Here's the original 1.5% grade looking straight up the hill) |
![]() |
![]() |
Here's a view of the finished cut before the roadbed was placed. (There was quite a bit of dirt left over. And more grading was done after the track was placed). |
| |
Here's a view of the finished cut with the main line track placed. (The new grade is about 0.25 %. |
![]() |
| |
Here's a view from the top of Pottery Hill all finished. (The 1st left turnout goes to |
![]() |