| All the steel
construction finished.
(The steel stringers and cross braces |
![]() |
![]() |
The top deck ties installed. (The wood ties are 1 3/4" high, 3/4" wide & 20" long. They have been soaked in used motor oil). |
| Track being placed
on the bridge.
(The bridge is 40 feet long and |
![]() |
![]() |
The top deck with rails installed. (The center guard rails are made of wood. The safety islands are removable for running as you can hit them with your feet. Don't ask me how I know this). |
| First run over the
new bridge.
(John tests out the new bridge |
![]() |
![]() |
Over the bridge again going the other way. (This is the operators view of the |