|
|
Go back to |
|
|
|||
| Home Page | Train Photos 2 | Click Here | ||||
| Trains Page |
| Here's where the steel trestle bridge will be placed. (The stakes mark the location |
![]() |
![]() |
One of twenty all steel bents. (It is made up from old shelving rack.You can see the slots for shelving along the top. The ends are plugged with wood. Note the steel foot pads to give support on the gravel foundation). |
| All the bents just
painted.
(The bents varied in size from |
![]() |
![]() |
The bridge construction begins.
(The stringers on top that connect the |
| The first few bents of the bridge in
place.
(The bents are set in the ground about
6" deep. |
|
![]() |
![]() |
|
Bridge construction well
underway.
(The view is looking south).
|
| <<< >>> | Train Photos 1 of 8 | NEXT>>> |